Documents
Community Bulletin
Documents submitted to Planning Inspectorate
Additional targeted consultation documents
Statutory consultation documents
-
Chapter 2: Design Evolution and Alternatives
Chapter 3: The Viking CCS Pipeline
Chapter 5: Assessment Methodology
Chapter 6: Ecology and Biodiversity
Chapter 7: Landscape and Visual
Chapter 8: Historic Environment
Chapter 9: Geology and Hydrogeology
Chapter 10: Agriculture and Soils
Chapter 12: Traffic and Transport
Chapter 13: Noise and Vibration
Chapter 17: Health and Wellbeing
Chapter 18: Materials and Waste
Chapter 19: Cumulative Effects
-
Appendix 3.1 Preliminary Draft CEMP
Appendix 3.2 Preliminary Crossing Schedule
Appendix 6.1 Ornithology Surveys Timeline
Appendix 6.2 Ornithology Summary Results
Appendix 9.1 GIS Output Tables
Appendix 9.2 The Coal Authority - Coal Mining Report
Appendix 11.1 Water Environment Baseline Supporting Information
Appendix 11.2 Site Visit Technical Note
Appendix 11.3 Preliminary WFD Assessment
Appendix 12.1 Transport Preliminary Construction Programme
Appendix 12.2 Preliminary Assessment Overview
Appendix 13.1 BS5228 Noise and Vibration
Appendix 14.1 Construction Dust Methodology